Sign up to save your library
With an OverDrive account, you can save your favorite libraries for at-a-glance information about availability. Find out more about OverDrive accounts.
Find this title in Libby, the library reading app by OverDrive.
Search for a digital library with this title
Title found at these libraries:
| Library Name | Distance |
|---|---|
| Loading... |
A history of post second world war steam locomotive design and construction in Great Britain, the perfect gift for railroad history buffs. After WWII the existing railway companies were all put into the control of the newly formed British Transport Commission and that government organization spawned British Railways, which came into being on January 1st 1948. The railway infrastructure had suffered badly during the war years and most of the steam locomotives were "tired" and badly maintained and or life expired. Although the management of British Railways was already planning to replace steam power with diesel and electric engines, they still decided to build more steam locomotives as a stop gap. Some 999 Standard locomotives were built in twelve classes ranging from super powerful express and freight engines to suburban tank locomotives. The locomotives were mainly in good order when the directive came in 1968 to end steam, some trains were only eight years old. There still exists a fleet of forty-six preserved Standards of which 75% are in working order in and around the UKs preserved railways, furthermore three new build standard locomotives are proposed. Steam fans who were around in the 1960s all remember the "Standards."
